ENGINEERING ONSHORE - OFFSHORE
FABRICATION & INSTALLATION PROJECT YEAR 2008
PTT FIELD ;-
- Pipe Support at BVW 01
- Pipe Support at BVW 01
- CLEANING METER TUBE
- Disposal of Waste 24' ERP-KNM No. 21-26 P/L
- Meter Tube LP&MP Khanom Maintenance & Service
- Disposal of Waste 24' ERP-KNM No. 27-28 P/L
- RT Inspection of PIG Obstruction in P/L
- Manpower Supply to Inspection Meter Tube at Power Plant in Rayong
- Relocation of Pipes, GSP, Rayong
- Installation of Drive Plate
- Paint Work for 36', 24' Body PIG 10 ea.
- CLEANING METER TUBE at GSP#3
- Waste Disposal Wang Noi
- Service for Replacing of HV-5823 with CCI Valve (Phase 1)
- PRP LQ Service Support Phase I
- PRP LQ Service Support Phase II
- PRP LQ Service Support Phase III & Tugboat Service
- REPLACING HV-5823 WITH CCI Valve Phase II
- 32" Bongkot - ERP Aggressive Cleaning PIG No. 2-3
- PIG Running Waste Disposal SPACP-ERP No.4-8
- Workbench and Furniture Accessories for PRP LQ
- Sling Accessories for PRP LQ
- BKT Shutdown Maintenance & Service at ERP.
- Installation of Communication Facilities ECP-ECPP
- Tugboat Service Support for PRP LQ Service Support
- PIG Running SPACP-ERP No. 9-16 and Waste Disposal
- Gas Generator G-5450 & 5460 Improvement at ERP.
- 32" PIG TRAY · Installation of 42' Launcher Tray & Receiver Tray, ERP.
- ERP-Cleaning & Inspection K.O. Drum
- Mercury Remove at BKT K.O. Drum
- 36' Lancher L-5060 and 24' Receive R-5070 and 24' Receive 2000 - LR -01
- Leaf Spring of 36'' & 24''
- Demonstration of P/L Leak Repair
- Maintenance Work Shop 380/220 Vac Supply Improvement
- Piping Inspection at Erawan Riser Platform
- Supply Drier at RPR
- Underground P/L 16' Repair & Coating
|
CHEVRON FIELD ;-
- Cage of PIG for PLWC
- Tank Cleaning for Unocal Barge No.11
- Architectural Toilet Shower Room Extension of EFSO
- Service Support for Expense Store Office at EFSO
- Architectural for Expense Store Office of EFSO
- TAWA COMMUNICATION BUILDING
- Replacement of Condenser Coils for HVAC units at SCPP Control Room
- Cold Room Floor Revamp Project
- Insulatorteam for Pailin Project CTEP
- CAGE OF PIG 8" for Pailin
- CAGE OF PIG 16" for Pailin
|
EXTERRAN FIELD ;-
- PMWH LCV Project Pipe Fabrication
- 100 By 10 of SAWE and SAWF
- 100 By 10 of SAWE and SAWF (SWD Platform)
- 100 By 10 of SAWE and SAWF (TRWA Platform)
- 100 By 10 of SAWE and SAWF (ERAWAN Platform)
- 100 by 10 SATUN FIELD (MANPOWER SUPPLY)
- PLATONG 100 by 10 (MANPOWER SUPPLY) BC Intergrated Work Project 100 By 10 (MANPOWER SUPPLY)
- ERWP 100 By 10 (MANPOWER SUPPLY)
- ERWW 100 By 10 (MANPOWER SUPPLY)
- PMWB 100 By 10 (MANPOWER SUPPLY) · PMWC 100 By 10 (MANPOWER SUPPLY)
- 100 By 10 Offshore (TOOLS AND EQUIPMENT RENTAL COSTS)
- 100 By 10 of SAWA and SAWF (Additional Purchase Costs)
- 100 By 10 FUNAN FIELD (MANPOWER SUPPLY)
- PLATONG 100 by 10 (MANPOWER SUPPLY & CONSUMABLE)
- 100 By 10 PLATONG FIELD (MANPOWER SUPPLY)
- FUNAN 100 by 10 (MANPOWER SUPPLY)
- PLATONG 100 by 10 (MANPOWER SUPPLY)
- ERAWAN 100 by 10 (MANPOWER SUPPLY)
- FUNAN 100 by 10 (MANPOWER SUPPLY)
- L-Spool for FUWK and FUWJ
- PMG & PMWI BC Piping Vibration Survey and Analysis
- 6" DOWNSTREAM OF FUWG
- VERTICAL & DOWNSTREAM LINE FOR JWC, SWB, EWP & SWJ
- PMWD PD PUMP SUCH / DISCH PIPE
- GL JET PUMP
- 6" O/P Assembly
- 100 by 10 of FUNAN & JAKRAWAN
|
CUEL FIELD ;-
- Platform Completion (Painting and Blasting) on Kudanil Explorer Phase 1-3
- Rental of Air Winches and Air Compressor for Riser Preparation
- Supply equipment for CUEL (Chevron Project)
- POT Jasmine B Tie-ins to Pearl D Project
- Chevron Platform Completion (M24) Phase I&II
- Chevron Platform Completion (M27)
- Welder Qualification Test for Jasmine D and Banyen A Topaide Installation
- Jasmine D and BYA Installation
- Modification Work for Jasmine Phase I&II
- Installation and Hook-up for Jasmine B and B2
- Onshore Frame Arrestor Spool Fabrication for Jasmine Platform
OTHER FIELD ;-
- Supply Equipment Rental for Offshore
- Supply Generator 220 KVA
- Supply Air Compressor 400 CFM
- Scaffolding Inspector Supply
- Tank Repair at Benz
- Manpower Supply on PRP - Hyundai
- PTT Siam - CNS (คลองเตย)
- Roll off Hinge Relocation
- NGV Transport Maintenance & Service
- Transport of Industrial Waste.
- Roll of Truck Service
- Cover Box
|
ENGINEERING ONSHORE OFFSHORE
FABRICATION & INSTALLATION PROJECT YEAR 2007
CHEVRON FIELD ;-
- Manpower Supply
- Equipment Rental
- 10" SACLCP & 16" SAGLCP Pipeline Crossing Correction
- I/E S' PALQ Additonal CCTV Installation
- Conduct PWHT
- I/E NPWA Booster Comp Installation
- I/E ERWT Added Wells
- SLQ A/C Unit Deck Extension
- FLQ A/C Unit Deck Extension
- I/E GOWC Added Wells
- The 2nd Hydraulic Reservoir Modification at PMWB and PMWD
- Funan PWIP Deck Extension
- I/E PLWD Added Wells
- YAWB Water Flood Pump Caission
- I/E KPWD Gas Lift Injection
- I/E PMWJ Gas Lift Injection
- I/E SLQ Lifeboat # 3 Installation
- FAT & NLT GL 01 Unit for Pre Installation
- I/E SUWA Multiphash Pump
- I/E PLWB Scada System Retrofit
- 16" SAPLE Pipeline Section Cut and Replacement
- I/E SLQ Expansion Project
- I/E Funan PWIP Proj.
- I/E PAWJ Added Wells
- Detailed Designing for NPWE Receiver on PAWC
- EFSO POB Increase
- PLCPP Additional Separator
- ERLQ1 Life Upgrade Project
|
CUEL FIELD ;-
- Air Conditioner
- Flowline Hook-up Jasmine A B C
- Chevron Platform Completion (LAWA, CBWA)
- CTEP Phase 31 - CUEL
- Degasser Installation of Jasmine A and Preparation Work for Jasmine B
EXTERRAN FIELD ;-
- UCT-PMWG Gas Lift Booster Comp
- SWL - Straight Pipe "UCT"
- Shim Plate
UCT PTT FIELD ;-
- Pipe Repair & Coating KP 73-233, Kanchanaburi - Ratchaburi
- Meter Tube Maintenance & Service, No. 5 Gas Separation Plant, Rayong
- Meter Tube Maintenance & service & Waste Disposal at Khanom
- PIG Running & Waste Disposal, SPACP-ERP
- Combine Cycle Plant and Terminal (Ratchaburi)
- 36' GEO & MFL PIG Running, ERP-Rayong
- Coating Repair KP-0135 Kanchanaburi-Saiyoke P/L
- Removal of Communication Facilities PLCPP-PLLQ
- 16' Pipeline Coating Repair STA 0+084 to 0+094 (Khonkaen)
- Inspection-Internal Corrosion KP.5
- I-Rods & Coating Test
OTHER FIELD ;-
- Blast & Paint CNS, Khlong Toey
- Supply for AQP Arthit Field
- Industrial Waste Recycle, SCCC, Saraburi.
- Supply Manpower for Lumut Site Malaysia
- Roll of Truck Service
- Corrosion Inhibitor & Diesel Tank
- Hook-Up & Installation for BL WPA Project
- Atlas - Installation Air Package & Skid Frame 2
- Supply of Bolt Tensioning Equipment & Personal
- Scaffolding Materials for CES
- Gas Separator at MR "Nakorn Pathom"
|
ENGINEERING ONSHORE OFFSHORE
FABRICATION & INSTALLATION PROJECT YEAR 2006
CHEVRON FIELD ;-
- SAWC & SAWD PT/TT Installation
- PMWH Gaslift Injection
- EPD Deck Extension
- SUWA 24" Trunkline Installation
- PMWB Added Wells Topside Structure
- VFD Installation
- YAWB Added Wells
- Fresh Air Duct for Platong CPP
- TRWB Added Wells
- Sand Probe Pipe
- PMWC Seawater Injection
- ERTC Opito Training Equipment & Pollution Control System
- PMWB Added Wells
- PMWD Added Wells
- ERMRP Piping Ties-In on ERCP (2nd Batch)
- KPWA 24" Trunkline Installation
- NPCPP MRU Deck Extension
- 6128 ERPLU Pipeline Stabilization
- NPCPP Water Injection Pump Installation
- ERWT Added Wells
- NPWD Water Injection Pump Installation
- Platong CCTV Installation
- SATUN CCTV Installation
- NPWD & NPCPP Water Injection
- 10" ERCLFSU2 Pipeline Freespan Rectification
- PLWD Scada System Retrofit
- PLWE Scada System Retrofit
- ERWK Booster Comp.
- SAWL Added Wells
- KPWB Added Well
- SATUN Fire Incident
- NPWA Booster Comp.
- Platong Gas MRU Installation
- I/E KPWB Added Wells
- PMWC Pilot Seawater Injection Plan Water Flood
- EWF Booster Comp.
- I/E ERWU Added Wells
- PLCPP Inlet Separator & Suction
- ERMRP Installation & Commissioning
- PMWC Solar Panel Installation
- TRWC Solar Panel Installation
- FUWM Pipeline Receiver Installation
- KPWA Riser Guard Installation
- SUWA Riser Guard Installation
- South Pailin Debottlenecking
- NPCPP Installation of Additional Bottom Condensate Cooler
- SCPP Switch Gears Room Expansion
- PLOCPP2 I&E Room
- Platong Solar Generator No.3 Control Upgrade
- SATUN Hot Oil Safety System Upgrade
- SATUN Condy Transfer Pump Installation
- EPB Air Compressor & Dryer Upgrade
- ERTC (SKL) Dust Collector# 2 Electrical System
- PMWG Structural Recovery
- ERWJ Added Wells
- Manpower Supply · Equipment Rental
|
PTT FIELD ;-
- Meter Tube 12" Inspection - Khanom
- PRP Bridge Installation (ERP)
- Paint work for Roofing Structure, TECO M/R, Ratchaburi
- PIG Receiver, Mercury Removal & Waste Disposal 2 No. 3-4
- PIG Housing - 5 EA
- Orifice Plate Maintenance & Service, Gas Separation Plant, Rayong
- PIG Receiving & Mercury Drain for Disposal of BKT-ERP P/L
- PIG Receiving of ERP-KNM No.5-13
- PIG Receiving of ERP-KNM No.5-12
- Water Drain from 2 Ponds, Wang Noi, Ayudhya
- Orifice Plate Maintenance & Service,No. 2x3 Gas Separation Plant, Rayong
- Installation of Bullet Tank, GSP Rayong
- Meter Tube Maintenance & Service, No.3 Gas Separation Plant, Rayong
- ERP Turbine Engine Unit C
- PIG Receiving at 36' (No. 42-52) & 34'(No. 37-44) P/L
- Modification of Launcher PL3820 at Bongkot
- Waste Disposal
- Gas Filter S-420A Maintenance & Service, GSP#3, Rayong
- Turbo Expander 2106-c/x-001, Maintenance & Service, at Khanom
- ERP MARS Engine Exchange Unit A
OTHER FIELD ;-
- Blast & Paint, CNS, Khlong Toey
- Industrail Waste Recycle, SCCC, Saraburi
- Transportation of Industrial Waste
- Repair Nozzle of 4th Stage Heat Exchanger Coil
- Equipment Rental Supply
- Rental of Container Open Top and Equipment - Valence
- Heating Coil Stainless 316
- Rental of Hydrotest Recorder
- "CUEL" Installation Air Package & Skid Frame
- Scaffolding Materials for CES
- Supply Manpower & Equipment Rental for CUEL
- Equipment Rental for " KMC Oiltools "
- Equipment Rantal "PAE"
|
|
|
|